Open

Open to input

These cities are actively looking for evidence, comparable cases and technical input. Contributions are made openly, on the record.

Open to input DEMO

Podgorica, Montenegro

Public buildings cost more to heat every year and nobody knows which ones

The municipality pays energy bills for roughly two hundred buildings from a single budget line. There is no per-building consumption record, no floor area register that matches the billing accounts, and no way to tell a badly insulated school from a badly operated one.

Energy Buildings
Indicative budget
Not yet estimated
Target period
2027 to 2029
Published
22 Jul 2026
Open to input DEMO

Novi Sad, Serbia

New housing districts are measurably hotter than the ones they replaced

Districts built in the past fifteen years have very little permeable surface or mature planting. Summer surface temperatures are visibly higher, and the planning rules that produced the outcome are still in force.

Resilience Public space
Indicative budget
Not yet estimated
Target period
Not yet set
Published
9 Jul 2026
Open to input DEMO

Izmir, Turkiye

Coastal infrastructure exposure has never been assessed as a whole

Assessments exist for individual assets, produced at different times, with different sea level assumptions and no shared method. There is no single view of what is exposed, on what timescale, or in what order it should be addressed.

Resilience Water
Indicative budget
€2m
Target period
2027 to 2030
Published
15 Jun 2026
Open to input DEMO

Tartu, Estonia

Cycling infrastructure that is unusable for four months of the year

Cycling volumes drop sharply once snow clearance begins, because cycle routes are cleared after roads and the cleared snow is deposited on them. The infrastructure exists; the winter operating model does not.

Mobility Public space
Indicative budget
€450,000
Target period
2027 to 2028
Published
30 Apr 2026

In structuring

Being turned into projects

ESCA is working with these cities on scope, funding route and requirements. Input is still useful, but the shape is settling.

In structuring DEMO

Kosice, Slovakia

Classroom air quality complaints with no measurement behind them

Teachers report headaches and poor concentration in specific school buildings, mostly those renovated for energy performance without ventilation upgrades. There is no measurement, so the complaints cannot be acted on or dismissed.

Buildings Public services
Indicative budget
€900,000
Target period
2027
Published
8 May 2026

Converted

Challenges that became projects

The point of the whole exercise. These entries remain published so the route from problem to project is visible.

Converted to project DEMO

Brno, Czechia

Twelve municipal systems, none of which can hand a case to another

Departments run separate systems procured over two decades. A resident case that touches two departments is re-entered by hand, and the city cannot report on end-to-end handling time for anything.

Public services Digital
Indicative budget
€4.5m
Target period
2027 to 2029
Published
17 Jan 2026

For cities

You do not need a complete project. Start with the challenge.

Most cities delay because they think they need a defined scope, a budget line and a funding route before they can ask for help. The opposite is true: those are the things ESCA helps produce.

Submitting a challenge starts no procurement procedure and creates no obligation.